1/3 scale Grunau Baby IIb by  Schneider - Airbrakes

 

Fuselage  

Wings   

Empennage 

RC gear installation  

All-up before covering 

back to intro

 

 

The airbrakes also are assembled from CNC-liteply parts : The kit contains no hardware to assemble, how to do it, and what materials to use for this, is up to the builder.

I used brass tubing, in the airbrake arms, sleeves of brass tubing are installed, these then rotate on shafts, also made out of brass tubing.

 

 

These shafts are attached to a plywood backplate, which is glued to the back of the mainspar, and the airbrakes are installed :

 

The airbrake bay is then built around the installed airbrake

 

Here the completed installation, on the l/h wing, the previous pictures are from the airbrake installation on the r/h wing.

For testing purposes, a Hitec HS-525BB is installed but the airbrakes will be operated by Hitec HS-475 HB's

 

I decided to modify the spoiler servo installation.

Here now the modified spoiler servo installation, the reason to change the setup, was, that with the previous setup, I would have had to increase the size of the sheeting around the spoiler bay, in order to be able to "hide" the servo under the sheeting. An added benefit is, that this way the pushrods are much shorter.

   

 

Upper sheeting on the spoiler bay installed, the picture to the right shows the lower sheeting, and the cover for the

servo bay, lower spoiler still needs to be faced.